The proposed interchange will accommodate the ultimate eight-lane section for IH 30. The proposed IH 30 overpass structure will span the 6-lane divided section for the SH 205 Bypass, left turn lanes and U-turn lanes. New exit and entrance ramps will also be constructed.
The SH 205 Bypass interchange must be completed prior to the FM 549 interchange reconstruction project so that the SH 205 Bypass can serve as a detour for FM 549.
Project Map and Proposed Sections